  ![epc](/sites/moore_law/files/styles/ratio_1_1_medium/public/2026-11/iStock-2285538993.jpg.webp?h=9f5479df&itok=XhIs-xKO) [\#Real Estate](/en/news?topic%5B279%5D=279) [\#Rent](/en/news?topic%5B385%5D=385) [\#Investments](/en/news?topic%5B386%5D=386)# Renovating during an ongoing tenancy: what about the rent?

 24/11/2026 | Reading time: 5 minutes 

 

 ![Sultana Azizi](/sites/moore_law/files/styles/ratio_1_1/public/2025-06/Sultana%20Azizi_063-Edit_HR.jpg?h=c7dd275c&itok=15y6Eggk)

Sultana Azizi

Lawyer

 

 [Contact](/en/contact) 

 

 

 

 

 
Energy performance is becoming increasingly important in the property market. Tenants no longer focus solely on the rent, but increasingly consider the EPC rating and expected energy costs. For landlords, an energy-efficient property is now an advantage when letting and often a necessary investment to remain competitive.

 

 

 

With winter approaching, many property owners are reviewing their property portfolios. Roof or cavity wall insulation, high-performance glazing, solar panels or heat pumps reduce energy consumption and can increase the value of a property.

If the property is already let, two legal questions arise. Can the landlord freely carry out renovation works? And can they subsequently pass on the cost of their investment through a higher rent?

## 1. Carrying out works in a rented property

It is a common misconception that landlords are free to renovate simply because they own the property. The landlord must ensure that the tenant can peacefully enjoy the rented property throughout the tenancy.

The tenant must allow urgent repairs to be carried out, even if they cause inconvenience. If these repairs take more than 30 days, the rent is reduced in proportion to the duration of the works and the part of the property that the tenant is unable to use. If the works make normal occupation of the property impossible, the tenant may request the termination of the tenancy agreement. Energy efficiency renovations are generally considered improvements rather than urgent repairs. It is therefore strongly advisable to consult the tenant and preferably reach a written agreement on the timing, access to the property and any compensation.

## 2. A higher rent after energy efficiency renovations?

### No automatic rent increase

Investments that improve the EPC rating do not automatically entitle the landlord to increase the rent. Apart from annual indexation, the rent generally remains fixed throughout the tenancy. The landlord cannot increase it unilaterally.

### A specific framework for energy-saving investments

The Flemish Housing Rental Decree (Vlaams Woninghuurdecreet) does, however, provide a specific framework for rent reviews following energy-saving investments. These are investments that improve the energy performance of the property.

Unlike the general rent review rules, which can only be applied at the end of each three-year period, landlords and tenants may agree to review the rent at any time following energy-saving investments.

If the tenant does not agree, the landlord may apply to the justice of the peace for a rent review. The judge can only grant the review if the investments have increased the normal rental value to at least 10% above the rent payable at the time of the application.

Investments required to bring the property into compliance with statutory requirements cannot give rise to a rent review, even by mutual agreement. This is particularly relevant for energy efficiency renovations: roof insulation and the replacement of single glazing are now part of the Flemish housing quality standards. Landlords who invest to meet these minimum standards cannot therefore recover these costs through the rent.

The judge rules on the basis of equity. The revised rent applies from the month following the full completion of the investments.

Works that do not improve energy efficiency fall under the general rules, which only allow a rent review at the end of each three-year period.

### Added value matters, not the cost

The cost of the works is not the deciding factor. What matters is the added value they bring to the normal rental value, meaning the rent that could be charged on the market for a comparable property. An investment of several tens of thousands of euros does not necessarily result in a 10% increase. Conversely, a smaller investment that significantly improves the EPC rating and comfort of the property may substantially increase its rental value.

The landlord must demonstrate this increase. In practice, the justice of the peace often appoints an expert for this purpose. The expert compares the property with similar rental properties in the surrounding area. The distinction between mandatory works and those that create genuine added value is a recurring point of discussion. Proper documentation of the property's condition before and after the works (EPC certificates, invoices, technical data sheets) is therefore essential.

## 3. Renovate now or wait?

For professional landlords, this is a strategic decision. Renovating during a tenancy can lead to discussions about access, inconvenience and the tenant's enjoyment of the property. On the other hand, the legislator has deliberately made it possible to review the rent at any time following energy-saving investments, rather than having to wait until the end of a three-year period.

As long as the current tenant remains in the property, the consequences of a less favourable EPC rating are often limited for the landlord. After all, it is primarily the tenant who pays the higher energy bills. The rating becomes particularly important when the property is relet. Waiting until the property becomes vacant can therefore be a reasonable choice: the works can be carried out more easily, and the improved energy performance can immediately be reflected in a new, market-based rent. However, legislation is increasingly linking energy performance to the landlord-tenant relationship, as illustrated by the temporary restrictions on rent indexation for properties with poor EPC ratings in 2022–2023 and the increasingly stringent housing quality standards. Landlords who wait too long risk seeing works that still create added value today become a legal requirement tomorrow, meaning they can no longer justify a rent review.

## Conclusion

The EPC rating has become much more than a technical certificate. It is increasingly the starting point for investment decisions that bring together property law, returns and energy policy. Anyone planning energy efficiency renovations in a rented property should therefore assess not only the technical and financial consequences, but also the legal implications for the existing tenancy. In practice, determining whether the conditions for a rent review are met is often less straightforward than it might initially seem.

 

 Broaden your knowledge about

 [\#Real Estate](/en/news?topic%5B279%5D=279) [\#Rent](/en/news?topic%5B385%5D=385) [\#Investments](/en/news?topic%5B386%5D=386)

Share this news

  

 



 Contact one of our experts

 

 [  ![](/sites/moore_law/files/styles/ratio_1_1/public/2025-06/Sultana%20Azizi_063-Edit_HR.jpg?h=c7dd275c&itok=15y6Eggk)  

### Sultana Azizi

Lawyer

 

 

  ](/en/contact) 

 [  ![](/sites/moore_law/files/styles/ratio_1_1/public/2025-03/Michiel%20Ryckalts17-Edit_HR.jpg?h=4f9df12c&itok=e7tLyXkX)  

### Michiel Ryckalts

Partner

 

 

  ](/en/contact) 

 

  

####  Related News 

  ![lease](/sites/moore_law/files/styles/ratio_3_2/public/2026-11/iStock-1211257509.jpg?h=666039eb&itok=bLyOE6Ht) 

######  [ General tenancy law under Book 7 of the Belgian Civil Code: key changes ](/en/news/general-tenancy-law-under-book-7-of-the-belgian-civil-code-key-changes) 

 [Real Estate](/en/news?topic%5B279%5D=279) [Tenancy law](/en/news?topic%5B395%5D=395) [Rent](/en/news?topic%5B385%5D=385) 

  

  

  ![Commercial property rental](/sites/moore_law/files/styles/ratio_3_2/public/2026-11/iStock-2261261248.jpg?h=62bc044e&itok=Pud5NEDu) 

######  [ Tacit renewal excluded? Beware of the one-month notice period ](/en/news/tacit-renewal-excluded-beware-of-the-onemonth-notice-period) 

 [Business premises](/en/news?topic%5B391%5D=391) [Lease agreement](/en/news?topic%5B392%5D=392) [Real Estate](/en/news?topic%5B279%5D=279) 

  

  

  ![Architect](/sites/moore_law/files/styles/ratio_3_2/public/2026-09/iStock-2158230808.jpg?h=724c7a05&itok=eKXqLWyW) 

######  [ Exempt interior renovations involving structural work: architect mandatory again ](/en/news/exempt-interior-renovations-involving-structural-work-architect-mandatory-again) 

 [Real Estate](/en/news?topic%5B279%5D=279) [Environmental law](/en/news?topic%5B302%5D=302) [Construction](/en/news?topic%5B258%5D=258)

## Structured data (JSON-LD)

```json
{
    "@context": "https://schema.org",
    "@graph": [
        {
            "@type": "NewsArticle",
            "@id": "https://www.moorelaw.be/en/markdownify/node/753",
            "name": "Renovating during an ongoing tenancy: what about the rent?",
            "image": {
                "@type": "ImageObject",
                "url": "https://www.moorelaw.be/sites/moore_law/files/styles/ratio_1_1/public/2026-11/iStock-2285538993.jpg?h=9f5479df&itok=mqUuB_3J"
            }
        },
        {
            "@type": "WebPage",
            "@id": "https://www.moorelaw.be/en/markdownify/node/753",
            "breadcrumb": {
                "@type": "BreadcrumbList",
                "itemListElement": [
                    {
                        "@type": "ListItem",
                        "position": 1,
                        "name": "Home",
                        "item": "https://www.moorelaw.be/en"
                    },
                    {
                        "@type": "ListItem",
                        "position": 2,
                        "name": "News",
                        "item": "https://www.moorelaw.be/en/news"
                    },
                    {
                        "@type": "ListItem",
                        "position": 3,
                        "name": "Renovating during an ongoing tenancy: what about the rent?",
                        "item": "https://www.moorelaw.be/en/markdownify/node/753"
                    }
                ]
            },
            "inLanguage": "en"
        }
    ]
}
```

